Home
|
Press
|
Events
|
Eshare
Sign in
/
Register
0
Shopping Cart
X
Close
My Products (0 items)
My shopping cart is empty.
.
Sign in
/
Register
X
Close
Login/Register
Email
Password
INDUSTRIES
Agriculture
Chemicals
Food & Feed
Pesticides
Titanium Dioxide (TiO2)
Dairy Products
Full Industry List
ONLINE DATABASE
TOOLBOX
Price Forecast
Price Index
Price Trend
PRODUCTS & SERVICE
Products' Introduction
Industrial Reports
Newsletters
Market Data
Content Byte
Agrochemical Regulatory
Customized solutions
IMPACT FACTOR
MARKET NEWS
Agriculture
Chemicals
Food & Feed
Other
ABOUT
About CCM
Why CCM?
CCM Story
CCM Clients
Events
Career
Company news
CONTACT
Home
Product
Complimentary download
Abu Dhabi Crude Oil Pipeline becomes operational
Recommend Report
Need some help to find your information ?
E-mail:
econtact@cnchemicals.com
Tel: +86-20-37616606
Search Report
Agriculture
Biotechnology
Chemicals
Economics and investment and financial
Energy and utilities
Food and Feed
Food and Feed (Ingredients)
Minerals/resources/mining
Pharmaceuticals and healthcare
Printing & packaging
More Reports >>
Recommend Newsletter
Related market data
Related product
Related research
Abu Dhabi Crude Oil Pipeline becomes operational
Keyword:
Publish time:
17
th
July, 2012
Source:
CNPC
Information collection and data processing: CCM For more information, please
contact us
On July 15, the commissioning ceremony of Abu Dhabi Crude Oil Pipeline project was held at the Fujairah Port where the pipeline's land terminal station is located. The project, with CNPC as the EPC contractor, integrates land and marine sections and is capable of transporting 75 million tons of crude oil annually. Managing Director of International Petroleum Investment Co. (IPIC) Khadem Abdulla Al Qubaisi hosted the ceremony. Mohamed bin Dhaen al-Hamli, Minister of Energy of the United Arab Emirates (UAE) and Huang Jiemin, Chinese ambassador to the UAE were also present and spoke highly of the project. CNPC Chairman Jiang Jiemin delivered congratulation to H. H. Shaikh Mansour Bin Zayed Al Nahyan, Deputy Prime Minister of the UAE and IPIC Chairman through phone call. CNPC Vice President Yu Baocai attended the ceremony.
At the end of November 2008, IPIC and CNPC's China Petroleum Engineering & Construction Corporation (CPECC) signed EPC contract with a total contract price of USD 3.29 billion. The Pipeline, from the Habshan Oilfield in the West to the Fujairah Port in the East, has a total length of 424.22 km, of which 405.36 km is on land with a diameter of 1,219 mm; and 18.86 km is offshore including 13.46 km submarine section. The designed rated delivery capacity is 1.5 million barrels per day which will be loaded through marine single point moorings. The first shipment of exported crude oil was loaded on July 5, 2012.
During construction, the project registered the local best record with no fatality, no environmental, medical and transportation accident for 50 million man hours. Thanks to the technology management standards which are more stringent than international ones, all qualified rates have reached to 100%.
Index Type:(required)
-- Please select --
Message:(required)
Name:(required)
Email:(required)
Tel:
Message:(required)
Name:(required)
Email:(required)
Tel: